Home » Case Studies »
City of Dover – Waste Water Treatment Lake Recovery
The City of Dover, New Hampshire leased our mobile Bargam centrifuge during the winter months of 2012. The City of Dover was in the interim of upgrading their dewatering equipment and needed to recover the water in their waste water treatment lakes. Fergus Power Pump, Inc. set up their mobile Bargam unit and provided consulting and training to maintain a solids separation of minimum 20 percent solids. The City of Dover operated the mobile unit for six a month term with operations seven days a week with 10 hour days to recover the water in the lagoons.